57 Nuthatch Knob Glastonbury, CT 06033-1359
Visit 57 Nuthatch Knob in Glastonbury, CT, 06033-1359
This profile includes property assessor report information, real estate records and a complete residency history.
We have include the current owner’s name and phone number to help you find the right person and learn more.
PROPERTY OVERVIEW
Type: Single Family
4 beds2.5 baths2,258 sqft
4 beds2.5 baths2,258 sqft
Facts
Built in 1973Stories: 2 Lot size: 0.32 acresExterior material: Wood Floor size: 2,258 sqftStructure type: Colonial Rooms: 9Roof type: Asphalt Bedrooms: 4Heat type: Baseboard Bathrooms: 2.5
Features
Fireplace
Other details
Units: 1
Recent residents
Resident Name | Phone | More Info |
---|---|---|
Christoph Baldwin | Status: Homeowner Occupation: Healthcare Support Occupations Education: High school graduate or higher |
|
James R Baldwin, age 70 | (860) 633-9500 | Status: Homeowner Occupation: Healthcare Support Occupations Education: High school graduate or higher |
Mary W Baldwin | (860) 633-9500 | |
Natalie Baldwin, age 41 | (860) 633-9500 | Status: Homeowner Education: High school graduate or higher |
Sharon C Baldwin, age 70 | (860) 633-9500 | |
Shawnee C Baldwin, age 70 | (860) 633-9500 | Status: Homeowner Occupation: Healthcare Support Occupations Education: High school graduate or higher |
Neighbors
42 Nuthatch Knob
J Bonfigho
J Bonfigho
Fire Incidents History
29 Oct 2002
Building fires
Property Use: 1 or 2 family dwelling
Actions Taken: Extinguish
Area of Origin: Wall assembly
First Ignition: Structural member or framing
Heat Source: Hot ember or ash
Factors Contributing to Ignition: Operational deficiency, other
Property Loss: $5,000
Actions Taken: Extinguish
Area of Origin: Wall assembly
First Ignition: Structural member or framing
Heat Source: Hot ember or ash
Factors Contributing to Ignition: Operational deficiency, other
Property Loss: $5,000
Incidents registered in Federal Emergency Management Agency
20 Jan 2001
Smoke or odor removal
Property Use: 1 or 2 family dwelling
Actions Taken: Identify, analyze hazardous materials
Actions Taken: Identify, analyze hazardous materials