7 Haley St Boston, MA 02119-1311
Visit 7 Haley St in Boston, MA, 02119-1311
This profile includes property assessor report information, real estate records and a complete residency history.
We have include the current owner’s name and phone number to help you find the right person and learn more.
Building Permits
Dec 5, 2011
Description: Install security system
- Contractor: Mark Brophy
- Valuation: $40,000
- Fee: $30.00 paid to City of Boston, Massachusetts
- Client: Williams B.&M.
- Parcel #: 1101790000
- Permit #: ELV107276
Jun 16, 2010
Description: Roof: strip and re roof approx 24 sq roof shingles and 5 sq rubber and repair 3 ceilings
- Valuation: $1,325,000
- Fee: $147.00 paid to City of Boston, Massachusetts
- Parcel #: 01790-000
- Permit #: SF30142
PROPERTY OVERVIEW
Type: Multiple Occupancy
8 beds2 bathsLot: 4,150 sqft
8 beds2 bathsLot: 4,150 sqft
Facts
Built in 1895Exterior material: Metal Lot size: 4,150 sqftExterior walls: Siding (Alum/Vinyl) Rooms: 17Basement: No Basement Bedrooms: 8Roof type: Asphalt Stories: 3 storyHeat type: Hot Water Last remodel year: 2001
Other details
Units: 2
Recent residents
Business records related to this address
Organization | Phone | More Info |
---|---|---|
T.Electrical | Industry: Electrical Contractor |
Neighbors
Assessment history
Year | Tax | Assessment | Market |
---|---|---|---|
2013 | $3,897 | $296,600 | N/A |
Fire Incidents History
20 Jan 2018
Building fires
Property Use: 1 or 2 family dwelling
Actions Taken: Extinguish
Area of Origin: Ceiling & floor assembly, crawl space b/t stories
First Ignition: Structural member or framing
Heat Source: Arcing
Factors Contributing to Ignition: Unspecified short-circuit arc
Property Loss: $40,000
Actions Taken: Extinguish
Area of Origin: Ceiling & floor assembly, crawl space b/t stories
First Ignition: Structural member or framing
Heat Source: Arcing
Factors Contributing to Ignition: Unspecified short-circuit arc
Property Loss: $40,000
03 Mar 2015
Building fires
Property Use: 1 or 2 family dwelling
Actions Taken: Extinguish
Area of Origin: Ceiling & floor assembly, crawl space b/t stories
First Ignition: Structural member or framing
Heat Source: Arcing
Factors Contributing to Ignition: Unspecified short-circuit arc
Equipment Involved: Electrical Distribution, Lighting & Power Transfer
Equipment Power: Electrical line voltage (>= 50 volts)
Equipment Portability: Stationary
Property Loss: $10,000
Contents Loss: $10,000
Actions Taken: Extinguish
Area of Origin: Ceiling & floor assembly, crawl space b/t stories
First Ignition: Structural member or framing
Heat Source: Arcing
Factors Contributing to Ignition: Unspecified short-circuit arc
Equipment Involved: Electrical Distribution, Lighting & Power Transfer
Equipment Power: Electrical line voltage (>= 50 volts)
Equipment Portability: Stationary
Property Loss: $10,000
Contents Loss: $10,000