8 Overledge Dr Derry, NH 03038
Visit 8 Overledge Dr in Derry, NH, 03038
This profile includes property assessor report information, real estate records and a complete residency history.
We have include the current owner’s name and phone number to help you find the right person and learn more.
PROPERTY OVERVIEW
Type: Single Family Residential
2 beds1 bathLot: 1.95 acres
2 beds1 bathLot: 1.95 acres
Facts
Built in 1979Basement: Partial Basement Lot size: 1.95 acresRoof type: Asphalt Rooms: 7Heat type: Electric Bedrooms: 2Cooling: Other Exterior walls: Siding (Alum/Vinyl)
Features
A/C
Listing info
Last sold: Oct 2009 for $125,000
Recent residents
| Resident Name | Phone | More Info |
|---|---|---|
| Pat A Meuse | (603) 432-3104 | |
| Patricia A Meuse, age 84 | (603) 432-3104 | |
| William F Meuse, age 82 | (603) 432-3104 | |
| Wm F Meuse, age 82 | (603) 432-3104 | |
| Sherri Tritto, age 55 | (603) 303-5828 | Occupation: Homemaker |
| Rick Vou | (603) 437-9223 | |
| Rick Voutour | (603) 973-1695 | Status: Renter Occupation: Construction and Extraction Occupations Education: High school graduate or higher |
Neighbors
11 Overledge Dr
A Randall
A Randall
Real estate transaction history
| Date | Event | Price | Source | Agents |
|---|---|---|---|---|
| 10/09/2009 | Sold | $125,000 | Public records | |
| 09/29/2009 | Sold | $90,000 | Public records | Steve and Phyllis Br... |
Assessment history
| Year | Tax | Assessment | Market |
|---|---|---|---|
| 2013 | $5,473 | $173,800 | N/A |
Fire Incidents History
21 Mar 2008
Building fires
Property Use: 1 or 2 family dwelling
Actions Taken: Fire, other
Area of Origin: Substructure area or space, crawl space
First Ignition: Structural member or framing
Heat Source: Hot ember or ash
Factors Contributing to Ignition: Construction deficiency
Factors Contributing to Ignition: Installation deficiency
Human Factors: Asleep
Equipment Involved: Heating, Ventilating & Air Conditioning
Equipment Power: Wood, paper
Equipment Portability: Stationary
Actions Taken: Fire, other
Area of Origin: Substructure area or space, crawl space
First Ignition: Structural member or framing
Heat Source: Hot ember or ash
Factors Contributing to Ignition: Construction deficiency
Factors Contributing to Ignition: Installation deficiency
Human Factors: Asleep
Equipment Involved: Heating, Ventilating & Air Conditioning
Equipment Power: Wood, paper
Equipment Portability: Stationary